Hang on...
Hang on...
If the video is not playing, or video player is not loading, try switching the server or refreshing the page.
5.3/10
0hr 01mins
Country:FR
A group of workers, aided by a steam-roller, are leveling the ground during the construction of the Jonage canal, a diversion of the Rhône river, which was built in order to supply the hydroelectric plant of Cusset.
$0.00
Lumière
Documentary
0hr 01mins
5.3/10
1897-05-19